Curriculum vitae
Gerald Amrhein
GULP: GULP-ID: 72039
XING: https://www.xing.com/profile/Gerald_Amrhein
Facebook: http://www.facebook.com/amrheing
Linkedin: https://www.linkedin.com/in/gerald-amrhein-9b257223/
eMail: gerald@amrhein.info
Soft Skills
- Flexibility in the acquisition of a wide range of tasks
- Empathy in dealing with people
- Communication skills in language and presentation
- Ability to abstract complex tasks
- Assertiveness
Qualifications and trainings
- BSI Grundschutzmethodik ISO27001
- Project Management Professional
- Supportingenieur Netzwerke
- Technik Informatiker (CDI)
- Study mechanical engineering
- Fachhochschulreife
- Ausbildung zum Werkzeugmacher (Gesellenbrief)
Sprachen
- German (native)
- Englisch (fluent)
Employment and project overview
My highest school-leaving qualification is the Fachhochschulreife.
Between secondary school and technical college, I trained as a toolmaker.
After 4 semesters of mechanical engineering, I went into IT.
I started with a one-year apprenticeship as a technical computer scientist (CDI), followed by further training as a network engineer, and always with a lot of personal commitment.
I have been learning new things all my life and hopefully that will never end.
I was employed for most of my professional life, and for a few years I worked as a freelance IT consultant.
I am not allowed to name my clients during my freelance work.
I am happy to provide information on request.
Support Engineer - Monitoring , PSI Software AG |
2016 - heute |
Development and operation of a monitoring system for decentralized, offline infrastructure in the KRITIS environment.
https://checkmk.com/de/produkt/case-studies/psi
Setting up a monitoring system |
12/2012 – 01/2013 |
Implementation of a Nagios system for the monitoring of:
- Hardware Komponenten
- Windows Servern
- Linux Servern
- Vmware Hostsystemen und virtuellen Systemen
- Telefonanlage
- Infrastrukturkomponenten
Business Consultant |
09/2011 – 12/2012 |
Consulting Services „ISO27001 nach IT-Grundschutz (BSI)“
- Analysis of requirements for the general decision to introduce a new service product
- Development of a virtual hospital to visualize the needs of management
- Dynamic PowerPoint presentation to illustrate critical elements
- Creation of adjusted network plans to illustrate the potential risks
- Comparison of a functional overview with a network plan
- Implementation of a virtual hospital in the GS tool
- Creating the individual elements from the virtual hospital
- Creating the physical and logical links
- Representation of the critical systems
- Evaluation of the protection requirement classes
- Carrying out an information security analysis for a pilot customer
- Actual assessment of the situation
- Presentation of the potential risks
- Presentation of the results to the customer
- Recommendation of a procedure to eliminate the risks
- Evaluation of processes and tools to optimize the workflow
- Advising my client on proactive management
- My client would like to expand its service portfolio to include proactive management and a management dashboard.
Based on my many years of experience with this client and very good contacts to their customers, I supported this project in defining the parameters as well as in the design of the presentation
Virtulisation |
09/2011 – 12/2012 |
Conversion of a complex customer system from classic server and workstation technology to virtualization.
A 24/7 operation with a maximum recovery time of 2 hours is required!
- Analysis of the initial situation
- Development of 3 possible variants
- 2 node clusters with shared storage and remote backup server (Veeam B&R) in second fire compartment (* target system)
- 2 room clusters with Datacore storage virtualization
- 2 single Vmware host systems with online replication of the virtual systems
- Procurement of the entire system
- Setup and commissioning
- Installation of the hardware
- Installation of Vmware System vSphere / ESX 5.x
- Installation of the virtual hosts (P2V, new installation)
- Configuration of the Active Directory, DHCP, DNS
- Configuration of the Veeam backup system version 6
- Test of recoverability in the required time
- Documentation and handover to an operational service provider
- User training for simple troubleshooting
- Training of support staff in Vmware implementation and support
- Hardening of the systems according to IT-Grundschutz (BSI)
Setting up a test system at my customer's premises for support and development purposes
- Procurement of hardware
- Installation of the above system as a “nested” Vmware system on a single physical server
- Documentation of this special solution
- Handover to the customer
- Customer workshop with project managers on Vmware technology
- Customer workshop in vmware installation, upgrade and administration
- Customer workshop in Veeam Backup & Replication before product decision
Projectmanager / IT Consultant |
01/2009 – 09/2011 |
- Project management in healthcare projects
- New implementations
- Upgrade of live systems
- Performance optimization and error analysis projects
- Projects to validate new releases of customer software
- Upgrade planning and implementation
- Sub-project management backend systems
- Sub-project management for radio relay networking
- Project management in troubleshooting projects
- Coordination of hardware manufacturer specialists
- Mediation between the partners involved
- Project planning
- Contact person for the customer in the troubleshooting process
- Analysis of performance and stability problems of SAN and NFS storage systems
- Hardware problems between Linux servers and FC SAN storage (emc2, FTS, Netapp)
- Hardware problems with NFS-connected long-term storage systems (Netapp)
- Software problems in the application and programming logic
- Advice on expanding the LAN / SAN / storage infrastructure
- Advice on the expansion or new acquisition of archive solutions
- Planning and implementation of Vmware cluster systems
- Planning and implementation of Vmware backup
- Setting up system management in the customer system
IT Consultant, SMP Management AG |
10/2008 – 01/2009 |
- System consulting on behalf of a German hardware manufacturer
- Calculation of storage systems based on customer requirements
- Selection of suitable hardware systems to meet the requirements
- Technical sub-project management in healthcare projects
- Infrastructure consulting in the run-up to healthcare projects
- Analysis of customer requirements and adaptation with the product portfolio
- Analysis of the customer infrastructure and development of the integration
IT-Consulting for PACS Systems |
02/2006 – 09/2008 |
Conception of IT infrastructure solutions for a German PACS manufacturer
Development of the server and SAN solution based on the software and customer requirements.
- Calculation of short-term and long-term storage systems based on end customer parameters
- Integration of special customer requirements into the SAN/LAN concept.
- Clarification of special requirements in the presales process.
- Conception of non-standard systems in cooperation with software development and product management.
- Technical sub-project management in the rollout phase of complex PACS systems and integration projects.
Microsoft Exchange Server Migration |
6/2005 – 01/2006 |
A German bank is migrating 12 Exchange 5.5 servers to a highly available Exchange 2003 cluster.
- Development of a detailed concept for the migration of 2500 user mailboxes and approx. 500 other objects using NetIQ Exchange Migrator.
- Test of the concept in the lab environment
- Installation and configuration of the Exchange 2003 cluster.
- Installation and configuration of the NetIQ migration platform.
- Migration of users.
- Training the administrators in Exchange 2003 administration.
- Development of a concept to support the administrators in standard processes.
Development of a central data store |
8/2005 |
A management consultant is looking for a central platform to store business-relevant information for 10 sales representatives.
An important aspect is the cost-effective and trouble-free operation of the system.
- Renting a dedicated server from 1&1
- Setup of a file and mail server.
- Integration of a data backup concept
- Implementation of terminal services
- Implementation of Sharepoint services
User migration Exchange GEO Cluster |
3/2005 – 5/2005 |
A German bank changes its service provider and the 3700 Exchange users are moved to a new Exchange 2003 GEO cluster.
- Development of test and installation scenarios for the GEO Cluster
- Developing test and installation scenarios for the components
- Virus scan and backup
- Installation and testing of the cluster system with all components
- Creating a scenario for the user transfer, taking into account
- the Windows NT/Outlook 98 client systems
- Implementation of the user transfer
- Documentation of all scenarios
- All sub-steps were handled in accordance with ISO
Planning and setting up a test environment |
2/2005 |
A flexible environment is required for integration tests for various customers in order to be able to map diverse requirements.
- 2 Domain controller (Microsoft Server 2003 Std.)
- 1 Terminalserver (Microsoft Server 2003 Std.)
- 1 Exchange 2003 Cluster (Microsoft Server 2003 Ent. + MS Exchange 2003 Ent.)
- 1 Microsoft SMS Server with Netinstall SW Distribution and OSD
- 1 Microsoft Operation Management Server
- Implementation on top of VMWare GSX Server 3.2
Server consolidation in a German bank |
3/2004 – 1/2005 |
A German bank replaces 3000 servers with new hardware.
- Customization of installation procedures for MS Windows NT4 Server, MS Windows 2000 Server and MS Windows Server 2003
- Error correction in driver installation files
- Development of a procedure for the secure creation of a network adapter team in Perl and VB-Script.
- Integration of installation procedures in different environments.
- Troubleshooting of existing procedures
- Adaptation of SMS procedures and error analysis within the SMS packages.
- Analysis of existing OSD procedures and identification of alternatives including cost estimation.
- Performance tests with different driver versions from the hardware supplier
- Documentation of the processes
Tax consulting firms |
1995 - 2007 |
Planning and implementation of the IT infrastructure of tax consulting firms.
- Planning and implementation of network cabling
- Planning / configuration and implementation of the server
- DATEV client / server model
- DATEV Terminal Server Model
- Implementation and configuration of the workstations
- Remote support of the law firms via VPN and RDP.
- Execution of server migrations under Novell Netware 3 and 4 to Microsoft Windows Server 2000 and 2003.
National engineering office |
2/2002 – 7/2002 |
Planning and realization of the IT infrastructure of a medium-sized engineering office server architecture.
- Planning the IT infrastructure of the new office building
- Cabling of the new office building
- Setting up the local client/server infrastructure
- Workstation connection and office implementation
- Connection of field service notebooks via GPRS
Senior Consultant, m+s Elektronik AG |
12/2000 – 6/2002 |
- Establishment of the “Content Management Systems” department
- Strategy development: “What does the department want to achieve?”
- Definition of resources
- Elaboration of the structures
- Partner acquisition
- Training organization
- Project realization
- Project management for eProcurement system solutions
BIT Manager, m+s Elektronik AG |
3/2000 – 11/2000 |
Requests for quotations that integrate more than 2 areas of the company are processed by the BIT Management Team.
- Definition of the tasks of a BIT manager
- Implementation of processes in the area of BIT management
- Supporting the junior consultants in specialist topics
- Preparation of complex offers involving all Group subsidiaries.
- Preparation of the customer presentation
- Presentation of the offer to the customer
Software distribution in a German bank |
12/1998 – 03/1999 |
Integration of a software distribution solution under Netinstall 3.x for approx. 5000 workstations at 3 locations.
- Development of a concept for distributed data storage of the Netinstall servers.
- Development of the logical server infrastructure
- Supervision of the physical implementation
- Developing and testing the distribution scripts and rules under Perl.
- Connection of 2 external locations to the central system
- Administration of the overall system during the rollout
- Administration of the 2 external locations during the relocation phases
Client migration in a German bank |
04/1999 – 09/1999 |
Planning and implementation of the migration of 400 notebooks with operating system and Office upgrade
- Conception of the OS upgrade from MS Windows 9x to MS Windows NT4
- Project planning of the OS upgrade from IBM OS2 2.x to IBM OS2 Warp
- Conception of the upgrade of applications in the Windows environment
- Project planning of the upgrade of applications in the OS2 environment
- Conception of the data transfer
- Planning the rollout: collection from the customer - upgrade - delivery to the customer - brief instruction
- Overall project management
International Industry |
6/1998 – 11/1998 |
Consulting, conceptual design and implementation of a client migration from SNA terminals to MS Office in a national environment. In addition, the necessary implementation of the entire server infrastructure.
- Preparation of the customer's requirements and presentation of an example solution.
- Conception of the server infrastructure based on MS Windows NT4 Server
- Conceptual design of the server room and its requirements.
- Conception of the LAN infrastructure, integrating the existing cabling in the plant.
- Installation of the servers on site in collaboration with the technicians
- Configuration of the individual services and servers
- Primary Domain Controller
- Backup Domain Controller
- File Server
- Backupserver
- SMS Server
- SNA Server
- Configuration and implementation of the SMS site structure
- Design and implementation of an environment for “roaming users”
- Project planning and overall project management
Technical Consultant, m+s Elektronik AG |
09/1995 – 05/1998 |
- Planning and realization of server / domain concepts based on Microsoft Windows NT
- Planning and implementation of Microsoft Windows NT solutions
- (file and print services, mail, backup, software distribution) in existing systems
- Planning and realization of “high availability solutions” based on Compaq server systems
- Planning and implementation of data backup concepts in a heterogeneous environment
System Engineer, GEODAT GmbH |
04/1993 – 06/1994 |
- Technical customer support
- Project planning and realization of Novell networks
System Engineer, Dötsch GmbH |
12/1991 – 03/1993 |
- Repair and maintenance of PCs and peripherals
- Configuration of PC systems
- Project planning of Novell networks
- Project planning and installation of IT infrastructure
System Engineer, Syscotec GmbH |
04/1991 – 11/1991 |
- Support for peripheral products in the PC sector
- Peer to peer networks
- Data backup drives
- Interface cards